Sherburne Co

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

CP 71-645-014 - 2017-CR 45 CSAH 9 to Rum River Dr ReconditionMinnesota Paving & Materials Knife River Corporation Veit & Company Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$45,696.63$45,696.63$67,500.00$67,500.00$80,000.00$80,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$0.01$0.01$3,800.00$3,800.00
2104.501REMOVE METAL CULVERTL F116$7.09$822.44$27.00$3,132.00$18.50$2,146.00
2104.503REMOVE BITUMINOUS PAVEMENTS F960$0.71$681.60$0.50$480.00$0.30$288.00
2104.503REMOVE BITUMINOUS DRIVEWAY PAVEMENTS F9,197$0.71$6,529.87$0.50$4,598.50$0.30$2,759.10
2104.503REMOVE CONCRETE DRIVEWAY PAVEMENTS F914$0.71$648.94$1.00$914.00$0.80$731.20
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)L F41$5.06$207.46$5.00$205.00$7.00$287.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F347$5.06$1,755.82$2.00$694.00$2.75$954.25
2104.523SALVAGE CULVERT MARKEREACH6$10.12$60.72$30.00$180.00$28.00$168.00
2104.523SALVAGE SIGNEACH49$35.43$1,736.07$35.00$1,715.00$28.00$1,372.00
2104.523SALVAGE MAIL BOX SUPPORTEACH44$35.43$1,558.92$35.00$1,540.00$55.00$2,420.00
2104.607SALVAGE RECLAIMED MATERIAL (EV)C Y10,143$7.59$76,985.37$5.00$50,715.00$2.60$26,371.80
2105.507SUBGRADE EXCAVATIONC Y25,307$4.05$102,493.35$7.00$177,149.00$17.00$430,219.00
2105.522SELECT GRANULAR BORROW (CV)C Y1,245$12.13$15,101.85$16.50$20,542.50$13.00$16,185.00
2105.525TOPSOIL BORROW (CV)CU YD300$19.94$5,982.00$15.00$4,500.00$37.00$11,100.00
2105.604GEOGRIDS Y18,209$2.32$42,244.88$2.50$45,522.50$2.31$42,062.79
2112.501SUBGRADE PREPARATIONRDST184$80.98$14,900.32$100.00$18,400.00$200.00$36,800.00
2123.509DOZERHOUR20$101.23$2,024.60$175.00$3,500.00$250.00$5,000.00
2130.501WATERMGAL500$1.01$505.00$1.00$500.00$35.00$17,500.00
2211.501AGGREGATE BASE CLASS 5TON17,673$10.48$185,213.04$10.85$191,752.05$13.75$243,003.75
2211.501AGGREGATE BASE CLASS 5 - DRIVEWAYSTON610$12.15$7,411.50$13.00$7,930.00$25.00$15,250.00
2215.501FULL DEPTH RECLAMATIONS Y62,919$0.36$22,650.84$0.90$56,627.10$1.85$116,400.15
2221.609SHOULDER BASE AGGREGATE SPECIALTON1,865$17.43$32,506.95$14.75$27,508.75$15.00$27,975.00
2231.501BITUMINOUS PATCHING MIXTURETON18$79.30$1,427.40$62.00$1,116.00$93.00$1,674.00
2232.604MILL BITUMINOUS PAVEMENT (SPECIAL)S Y164$10.30$1,689.20$1.00$164.00$11.50$1,886.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON10,581$47.50$502,597.50$41.00$433,821.00$59.00$624,279.00
2360.501TYPE SP 9.5 WEARING COURSE MIX (3,C)TON8,867$48.13$426,768.71$46.00$407,882.00$60.00$532,020.00
2451.509AGGREGATE BEDDING (CV)C Y48$26.32$1,263.36$55.00$2,640.00$75.00$3,600.00
2501.51136" CP PIPE CULVERTL F58$53.65$3,111.70$80.00$4,640.00$900.00$52,200.00
2501.51536" CS PIPE APRONEACH6$708.59$4,251.54$1,000.00$6,000.00$3,275.00$19,650.00
2501.573INSTALL CULVERT MARKEREACH6$35.43$212.58$40.00$240.00$45.00$270.00
2531.5076" CONCRETE DRIVEWAY PAVEMENTS Y86$86.04$7,399.44$72.00$6,192.00$45.00$3,870.00
2540.602MAIL BOX SUPPORTEACH39$106.29$4,145.31$105.00$4,095.00$121.00$4,719.00
2545.5231.25" NON-METALLIC CONDUITL F18,175$4.17$75,789.75$4.12$74,881.00$5.00$90,875.00
2550.514FIBEROPTIC SPLICE VAULTEACH10$930.27$9,302.70$919.00$9,190.00$2,156.00$21,560.00
2563.601TRAFFIC CONTROLLS1$2,429.44$2,429.44$8,400.00$8,400.00$2,700.00$2,700.00
2563.601DETOUR SIGNINGLS1$4,049.07$4,049.07$5,100.00$5,100.00$4,500.00$4,500.00
2564.602INSTALL STEEL POSTEACH5$35.43$177.15$35.00$175.00$66.50$332.50
2573.502SILT FENCE, TYPE MSL F7,247$1.67$12,102.49$1.65$11,957.55$1.85$13,406.95
2573.560CULVERT END CONTROLSEACH6$75.92$455.52$75.00$450.00$83.00$498.00
2573.601STORM WATER MANAGEMENTLS1$4,829.39$4,829.39$2,600.00$2,600.00$2,600.00$2,600.00
2573.610SEDIMENT REMOVALHOUR10$101.23$1,012.30$1.00$10.00$310.00$3,100.00
2574.508FERTILIZER TYPE 1LB480$0.46$220.80$0.45$216.00$0.50$240.00
2575.501SEEDINGACRE2.4$101.23$242.95$100.00$240.00$112.00$268.80
2575.502SEED MIXTURE 21-111LB120$0.47$56.40$0.46$55.20$0.50$60.00
2575.502SEED MIXTURE 25-121LB146$3.57$521.22$3.53$515.38$4.00$584.00
2575.562HYDRAULIC MATRIX TYPE MULCHLB5,040$0.71$3,578.40$0.70$3,528.00$0.80$4,032.00
2582.5024" BROKEN LINE-PAINTL F1,786$0.08$142.88$0.10$178.60$0.08$142.88
2582.5024" SOLID LINE-PAINTL F41,034$0.08$3,282.72$0.08$3,282.72$0.08$3,282.72
2582.5024" DOUBLE SOLID LINE-PAINTL F10,560$0.15$1,584.00$0.15$1,584.00$0.17$1,795.20
 Totals for project CP 71-645-014 $1,640,363.09 $1,674,758.86 $2,476,939.09
 
Contract Total:$1,640,363.09$1,674,758.86$2,476,939.09