Bid Abstract

CP 71-642-016 - 2017-CR 42 CSAH 1 to CR 45Knife River Corporation Minnesota Paving & Materials Veit & Company Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$28,500.00$28,500.00$30,000.00$30,000.00$80,000.00$80,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$0.01$0.01$1.00$1.00$3,800.00$3,800.00
2104.501REMOVE CONCRETE CULVERTL F180$30.00$5,400.00$20.25$3,645.00$17.00$3,060.00
2104.503REMOVE CONCRETE DRIVEWAY PAVEMENTS F863$1.00$863.00$0.71$612.73$0.80$690.40
2104.503REMOVE BITUMINOUS PAVEMENTS F3,480$0.50$1,740.00$0.71$2,470.80$0.30$1,044.00
2104.503REMOVE BITUMINOUS DRIVEWAY PAVEMENTS F1,501$0.50$750.50$0.71$1,065.71$0.30$450.30
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)L F42$5.00$210.00$2.53$106.26$7.00$294.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F170$2.00$340.00$2.53$430.10$2.75$467.50
2104.523SALVAGE CULVERT MARKEREACH4$30.00$120.00$10.12$40.48$28.00$112.00
2104.523SALVAGE MAIL BOX SUPPORTEACH22$35.00$770.00$35.43$779.46$55.00$1,210.00
2104.523SALVAGE SIGNEACH22$35.00$770.00$35.43$779.46$28.00$616.00
2105.501COMMON EXCAVATIONC Y377$10.00$3,770.00$8.10$3,053.70$130.00$49,010.00
2105.522SELECT GRANULAR BORROW (CV)C Y2,430$16.50$40,095.00$12.13$29,475.90$26.00$63,180.00
2105.525TOPSOIL BORROW (CV)CU YD100$15.00$1,500.00$20.25$2,025.00$37.00$3,700.00
2112.501SUBGRADE PREPARATIONRDST115$100.00$11,500.00$80.98$9,312.70$160.50$18,457.50
2123.509DOZERHOUR20$175.00$3,500.00$101.23$2,024.60$251.00$5,020.00
2130.501WATERMGAL250$1.00$250.00$1.01$252.50$35.00$8,750.00
2211.501AGGREGATE BASE CLASS 5TON2,023$13.00$26,299.00$10.27$20,776.21$17.00$34,391.00
2211.501AGGREGATE BASE CLASS 5 - DRIVEWAYSTON277$13.00$3,601.00$32.14$8,902.78$24.25$6,717.25
2215.501FULL DEPTH RECLAMATIONS Y39,409$0.90$35,468.10$0.36$14,187.24$1.60$63,054.40
2221.609SHOULDER BASE AGGREGATE SPECIALTON1,010$14.75$14,897.50$19.27$19,462.70$14.00$14,140.00
2231.501BITUMINOUS PATCHING MIXTURETON70$62.00$4,340.00$79.31$5,551.70$93.00$6,510.00
2232.604MILL BITUMINOUS PAVEMENT (SPECIAL)S Y72$1.00$72.00$19.56$1,408.32$21.75$1,566.00
2360.501TYPE SP 9.5 WEARING COURSE MIX (2,C)TON5,123$44.00$225,412.00$48.13$246,569.99$60.00$307,380.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,C)TON4,950$39.00$193,050.00$47.50$235,125.00$59.00$292,050.00
2451.509AGGREGATE BEDDING (CV)C Y50$55.00$2,750.00$26.32$1,316.00$77.00$3,850.00
2501.51136" CP PIPE CULVERTL F122$100.00$12,200.00$53.65$6,545.30$750.00$91,500.00
2501.51160" CP PIPE CULVERTL F72$165.00$11,880.00$121.47$8,745.84$1,103.00$79,416.00
2501.51536" CS PIPE APRONEACH2$1,550.00$3,100.00$759.20$1,518.40$3,275.00$6,550.00
2501.51560" CS PIPE APRONEACH2$2,600.00$5,200.00$1,619.63$3,239.26$6,350.00$12,700.00
2501.573INSTALL CULVERT MARKEREACH4$40.00$160.00$35.43$141.72$45.00$180.00
2531.5076" CONCRETE DRIVEWAY PAVEMENTS Y108$72.00$7,776.00$101.23$10,932.84$50.00$5,400.00
2540.602MAIL BOX SUPPORTEACH19$105.00$1,995.00$106.29$2,019.51$122.00$2,318.00
2563.601TRAFFIC CONTROLLS1$6,900.00$6,900.00$2,429.44$2,429.44$2,700.00$2,700.00
2564.602INSTALL STEEL POSTEACH3$35.00$105.00$35.43$106.29$66.00$198.00
2573.502SILT FENCE, TYPE MSL F1,302$1.65$2,148.30$1.67$2,174.34$1.85$2,408.70
2573.560CULVERT END CONTROLSEACH4$75.00$300.00$75.92$303.68$84.00$336.00
2573.601STORM WATER MANAGEMENTLS1$2,600.00$2,600.00$4,829.39$4,829.39$2,600.00$2,600.00
2573.610SEDIMENT REMOVALHOUR10$1.00$10.00$101.23$1,012.30$310.00$3,100.00
2574.508FERTILIZER TYPE 1LB364$0.45$163.80$0.46$167.44$0.50$182.00
2575.501SEEDINGACRE2$100.00$200.00$101.23$202.46$112.00$224.00
2575.502SEED MIXTURE 25-121LB111$3.53$391.83$3.57$396.27$4.00$444.00
2575.502SEED MIXTURE 21-111LB91$0.46$41.86$0.47$42.77$0.50$45.50
2575.562HYDRAULIC MATRIX TYPE MULCHLB3,822$0.70$2,675.40$0.71$2,713.62$0.80$3,057.60
2582.5024" DOUBLE SOLID LINE-PAINTL F6,555$0.15$983.25$0.15$983.25$0.17$1,114.35
2582.5024" BROKEN LINE-PAINTL F1,085$0.08$86.80$0.08$86.80$0.08$86.80
2582.5024" SOLID LINE-PAINTL F26,915$0.08$2,153.20$0.08$2,153.20$0.08$2,153.20
 Totals for project CP 71-642-016 $667,038.55 $690,119.46 $1,186,234.50
 
Contract Total:$667,038.55$690,119.46$1,186,234.50