Sherburne Co

Welcome, Guest!
Log in | Employee Login | License
 

Contract Bid Abstract

SAP 71-603-023 - 2018-CSAH 3 Bridge 71503 ReplacementRedstone Construction, LLC Robert R. Schroeder Construction, Inc. Structural Specialties, Inc. S & R Reinforcing, Inc. S.M. Hentges & Son, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$88,000.00$88,000.00$82,836.00$82,836.00$55,184.09$55,184.09$88,828.00$88,828.00$93,450.00$93,450.00
2101.505GRUBBINGACRE0.29$10,300.00$2,987.00$10,328.28$2,995.20$10,328.28$2,995.20$1,000.00$290.00$10,550.00$3,059.50
2101.505CLEARINGACRE0.29$15,500.00$4,495.00$15,492.41$4,492.80$15,492.41$4,492.80$4,000.00$1,160.00$15,800.00$4,582.00
2101.524GRUBBINGTREE13$71.00$923.00$71.20$925.60$71.20$925.60$75.00$975.00$73.00$949.00
2101.524CLEARINGTREE13$107.00$1,391.00$106.80$1,388.40$106.80$1,388.40$300.00$3,900.00$109.00$1,417.00
2104.502SALVAGE SIGNEACH14$15.00$210.00$15.00$210.00$15.00$210.00$30.00$420.00$36.00$504.00
2104.503REMOVE GUARDRAILL F457$5.00$2,285.00$6.00$2,742.00$5.00$2,285.00$7.50$3,427.50$6.15$2,810.55
2104.503REMOVE FENCEL F377$3.00$1,131.00$3.00$1,131.00$3.00$1,131.00$5.00$1,885.00$5.10$1,922.70
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F56$3.00$168.00$3.00$168.00$3.00$168.00$3.00$168.00$5.00$280.00
2104.503REMOVE PIPE CULVERTSL F97$10.00$970.00$10.00$970.00$10.00$970.00$10.00$970.00$14.00$1,358.00
2104.504REMOVE BITUMINOUS PAVEMENTS Y2,117$2.75$5,821.75$2.65$5,610.05$2.65$5,610.05$2.65$5,610.05$6.50$13,760.50
2105.507SELECT GRANULAR BORROW (LV)C Y3,043$12.50$38,037.50$12.50$38,037.50$12.50$38,037.50$12.50$38,037.50$17.25$52,491.75
2105.507GRANULAR BORROW MOD 15% (CV)(P)C Y780$15.00$11,700.00$15.00$11,700.00$15.00$11,700.00$15.00$11,700.00$28.00$21,840.00
2105.607EXCAVATION SPECIAL (P)C Y726$7.00$5,082.00$7.00$5,082.00$7.00$5,082.00$7.00$5,082.00$12.00$8,712.00
2123.5103.0 CU YD SHOVELHOUR8$150.00$1,200.00$150.00$1,200.00$150.00$1,200.00$150.00$1,200.00$195.00$1,560.00
2123.510DOZERHOUR8$135.00$1,080.00$135.00$1,080.00$135.00$1,080.00$135.00$1,080.00$170.00$1,360.00
2211.507AGGREGATE BASE (CV) CLASS 5C Y1,117$20.00$22,340.00$19.75$22,060.75$19.75$22,060.75$19.75$22,060.75$27.00$30,159.00
2221.603SHOULDER BASE AGGREGATE SPECIALTON55$30.00$1,650.00$29.75$1,636.25$29.75$1,636.25$29.75$1,636.25$45.00$2,475.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGAL135$4.00$540.00$4.00$540.00$4.00$540.00$5.00$675.00$4.10$553.50
2360.509TYPE SP 12.5 WEARING COURSE MIX (2,C)TON571$85.00$48,535.00$85.00$48,535.00$85.00$48,535.00$85.00$48,535.00$86.70$49,505.70
2401.503TYPE S (TL-4) BARRIER CONC (3S52)L F386$50.00$19,300.00$90.00$34,740.00$76.00$29,336.00$76.00$29,336.00$132.00$50,952.00
2401.507STRUCTURAL CONCRETE (3B52)C Y140$750.00$105,000.00$550.00$77,000.00$650.00$91,000.00$1,273.65$178,311.00$1,000.00$140,000.00
2401.508REINFORCEMENT BARS (EPOXY COATED)LB74,900$1.25$93,625.00$1.30$97,370.00$1.25$93,625.00$1.48$110,852.00$1.25$93,625.00
2401.508REINFORCEMENT BARS (STAINLESS-60KSI)LB520$3.75$1,950.00$6.00$3,120.00$5.50$2,860.00$6.00$3,120.00$5.50$2,860.00
2401.601SLOPE PROTECTIONLS1$6,000.00$6,000.00$6,500.00$6,500.00$4,802.00$4,802.00$7,500.00$7,500.00$15,000.00$15,000.00
2401.601STRUCTURE EXCAVATIONLS1$5,000.00$5,000.00$24,000.00$24,000.00$6,300.00$6,300.00$6,000.00$6,000.00$200,000.00$200,000.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M)S F7,346$25.50$187,323.00$22.00$161,612.00$26.00$190,996.00$27.21$199,884.66$44.00$323,224.00
2402.502FLOOR DRAIN TYPE B706 MODIFIEDEACH4$1,130.00$4,520.00$650.00$2,600.00$84.00$336.00$1,093.00$4,372.00$1,100.00$4,400.00
2402.502ELASTOMERIC BEARING PAD TYPE 1EACH30$77.50$2,325.00$150.00$4,500.00$56.00$1,680.00$85.00$2,550.00$75.00$2,250.00
2405.503PRESTRESSED CONCRETE BEAMS 27ML F844$225.00$189,900.00$275.00$232,100.00$250.00$211,000.00$214.45$180,995.80$215.00$181,460.00
2406.504BRIDGE APPROACH PANELSS Y411$170.00$69,870.00$200.00$82,200.00$275.00$113,025.00$190.11$78,135.21$201.00$82,611.00
2442.501REMOVE EXISTING BRIDGELS1$85,000.00$85,000.00$125,000.00$125,000.00$115,000.00$115,000.00$118,147.00$118,147.00$199,040.00$199,040.00
2452.502C-I-P CONC TEST PILE 90 FT LONG 12"EACH1$10,000.00$10,000.00$6,000.00$6,000.00$9,600.00$9,600.00$5,100.00$5,100.00$6,000.00$6,000.00
2452.502PILE POINTS 12"EACH12$250.00$3,000.00$210.00$2,520.00$270.00$3,240.00$195.00$2,340.00$200.00$2,400.00
2452.502PILE POINTS 16"EACH14$325.00$4,550.00$310.00$4,340.00$320.00$4,480.00$246.00$3,444.00$250.00$3,500.00
2452.502PILE REDRIVINGEACH26$150.00$3,900.00$50.00$1,300.00$115.00$2,990.00$350.00$9,100.00$400.00$10,400.00
2452.502C-I-P CONC TEST PILE 105 FT LONG 16"EACH2$15,000.00$30,000.00$12,000.00$24,000.00$15,900.00$31,800.00$7,000.00$14,000.00$9,000.00$18,000.00
2452.502C-I-P CONC TEST PILE 70 FT LONG 12"EACH1$9,000.00$9,000.00$5,000.00$5,000.00$9,100.00$9,100.00$4,000.00$4,000.00$5,000.00$5,000.00
2452.603C-I-P CONCRETE PILING 12"L F700$28.00$19,600.00$14.00$9,800.00$29.50$20,650.00$56.19$39,333.00$39.00$27,300.00
2452.603C-I-P CONCRETE PILING 16"L F1,140$38.00$43,320.00$26.00$29,640.00$46.50$53,010.00$65.47$74,635.80$57.50$65,550.00
2501.50215" RC PIPE APRONEACH1$680.00$680.00$675.00$675.00$675.00$675.00$675.00$675.00$950.00$950.00
2501.50218" GS PIPE APRONEACH2$425.00$850.00$425.00$850.00$425.00$850.00$425.00$850.00$340.00$680.00
2501.50318" CS PIPE CULVERTL F160$24.00$3,840.00$24.00$3,840.00$24.00$3,840.00$24.00$3,840.00$41.00$6,560.00
2503.50315" RC PIPE SEWER DES 3006 CL IIIL F50$44.50$2,225.00$44.38$2,219.00$44.38$2,219.00$44.38$2,219.00$59.00$2,950.00
2506.502CASTING ASSEMBLYEACH2$500.00$1,000.00$500.00$1,000.00$500.00$1,000.00$500.00$1,000.00$755.00$1,510.00
2506.503CONST DRAINAGE STRUCTURE DESIGN GL F8.2$472.00$3,870.40$471.54$3,866.63$471.54$3,866.63$471.54$3,866.63$480.00$3,936.00
2511.504GEOTEXTILE FILTER TYPE 7S Y1,080$2.50$2,700.00$2.00$2,160.00$2.50$2,700.00$3.00$3,240.00$3.25$3,510.00
2511.504GEOTEXTILE FILTER TYPE 4S Y26.2$3.00$78.60$1.00$26.20$4.00$104.80$3.00$78.60$5.00$131.00
2511.507RANDOM RIPRAP CLASS IIIC Y540$69.50$37,530.00$70.00$37,800.00$60.00$32,400.00$55.00$29,700.00$77.00$41,580.00
2511.507RANDOM RIPRAP CLASS IIIC Y6.8$69.50$472.60$70.00$476.00$60.00$408.00$55.00$374.00$77.00$523.60
2531.503CONCRETE CURB & GUTTER DESIGN B624L F33$70.00$2,310.00$20.00$660.00$51.00$1,683.00$35.50$1,171.50$48.00$1,584.00
2554.502END TREATMENT-TANGENT TERMINALEACH4$3,000.00$12,000.00$3,000.00$12,000.00$3,000.00$12,000.00$3,225.00$12,900.00$3,060.00$12,240.00
2554.503TRAFFIC BARRIER DESIGN TYPE 31L F175$31.50$5,512.50$31.25$5,468.75$31.25$5,468.75$33.45$5,853.75$32.00$5,600.00
2554.503TRAFFIC BARRIER DESIGN TRANS TYPE 31L F100$106.00$10,600.00$105.75$10,575.00$105.75$10,575.00$113.15$11,315.00$108.00$10,800.00
2557.503INSTALL FENCE, DESIGN BARBED WIREL F368$10.00$3,680.00$25.00$9,200.00$19.00$6,992.00$10.50$3,864.00$19.50$7,176.00
2563.601TRAFFIC CONTROLLS1$5,500.00$5,500.00$7,500.00$7,500.00$5,500.00$5,500.00$7,250.00$7,250.00$5,560.00$5,560.00
2573.501EROSION CONTROL SUPERVISORLS1$500.00$500.00$1.00$1.00$500.00$500.00$1,000.00$1,000.00$7,250.00$7,250.00
2573.502CULVERT END CONTROLSEACH2$175.00$350.00$175.00$350.00$300.00$600.00$200.00$400.00$178.50$357.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERL F436$15.00$6,540.00$15.00$6,540.00$15.00$6,540.00$15.00$6,540.00$15.30$6,670.80
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F60$5.00$300.00$5.00$300.00$5.00$300.00$5.00$300.00$5.10$306.00
2573.503SILT FENCE, TYPE MSL F1,458$2.00$2,916.00$2.00$2,916.00$2.00$2,916.00$2.00$2,916.00$2.05$2,988.90
2575.501TURF ESTABLISHMENTLS1$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00$3,570.00$3,570.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NS Y3,691$1.95$7,197.45$1.95$7,197.45$1.95$7,197.45$1.95$7,197.45$2.00$7,382.00
2575.523RAPID STABILIZATION METHOD 3MGAL36$150.00$5,400.00$150.00$5,400.00$150.00$5,400.00$150.00$5,400.00$153.00$5,508.00
2582.5034" BROKEN LINE PAINTL F165$1.25$206.25$1.25$206.25$1.18$194.70$1.20$198.00$1.30$214.50
2582.5036" SOLID LINE PAINTL F1,650$1.40$2,310.00$1.40$2,310.00$1.33$2,194.50$1.50$2,475.00$1.45$2,392.50
2582.5034" SOLID LINE PAINTL F825$1.25$1,031.25$1.25$1,031.25$1.18$973.50$1.20$990.00$1.30$1,072.50
 Totals for project SAP 71-603-023 $1,254,829.30 $1,294,751.08 $1,320,659.97 $1,427,910.45 $1,869,325.00
 
Contract Total:$1,254,829.30$1,294,751.08$1,320,659.97$1,427,910.45$1,869,325.00