CP 71-606-017 - 2019-Reclaim/Bit Overlay CSAH 6Knife River Corporation Minnesota Paving & Materials Central Specialties Inc Asphalt Surface Technologies Corp 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$53,500.00$53,500.00$22,700.00$22,700.00$117,000.00$117,000.00$47,500.00$47,500.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$0.01$0.01$1.00$1.00$1.00$1.00$5,000.00$5,000.00
2104.502SALVAGE CULVERT MARKEREACH4$10.00$40.00$20.00$80.00$20.00$80.00$50.00$200.00
2104.503REMOVE PIPE CULVERTSL F362$6.00$2,172.00$15.00$5,430.00$11.50$4,163.00$10.00$3,620.00
2104.503SAWING CONCRETE PAVEMENT (FULL DEPTH)L F19$3.00$57.00$3.00$57.00$6.00$114.00$10.00$190.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F359$3.00$1,077.00$3.00$1,077.00$2.50$897.50$2.25$807.75
2104.503REMOVE BITUMINOUS CURBL F120$2.00$240.00$5.00$600.00$8.00$960.00$2.50$300.00
2104.504REMOVE BITUMINOUS PAVEMENTS Y5,492$1.85$10,160.20$2.25$12,357.00$3.50$19,222.00$3.00$16,476.00
2104.518REMOVE CONCRETE DRIVEWAY PAVEMENTS F694$2.00$1,388.00$1.00$694.00$2.25$1,561.50$1.50$1,041.00
2104.518REMOVE BITUMINOUS DRIVEWAY PAVEMENTS F3,426$0.80$2,740.80$0.75$2,569.50$1.75$5,995.50$0.75$2,569.50
2104.623SALVAGE MAIL BOX SUPPORTEACH26$35.00$910.00$34.90$907.40$35.00$910.00$38.00$988.00
2104.623SALVAGE FIRE NUMBEREACH17$35.00$595.00$34.90$593.30$35.00$595.00$38.00$646.00
2105.507COMMON EXCAVATION (P)C Y8,614$8.25$71,065.50$6.90$59,436.60$14.75$127,056.50$10.50$90,447.00
2105.507SELECT GRANULAR BORROW (CV)C Y750$10.00$7,500.00$13.00$9,750.00$30.50$22,875.00$13.00$9,750.00
2123.510DOZERHOUR10$125.00$1,250.00$89.80$898.00$158.00$1,580.00$150.00$1,500.00
2130.523WATERMGAL250$1.00$250.00$20.00$5,000.00$30.00$7,500.00$30.00$7,500.00
2211.501AGGREGATE BASE CLASS 5 (P)TON13,845$14.30$197,983.50$13.10$181,369.50$14.00$193,830.00$16.00$221,520.00
2215.501BITUMINOUS PAVEMENT RECLAMATIONS Y48,111$0.95$45,705.45$1.10$52,922.10$1.00$48,111.00$1.50$72,166.50
2221.609SHOULDER BASE AGGREGATE SPECIALTON3,400$13.45$45,730.00$16.70$56,780.00$23.00$78,200.00$35.00$119,000.00
2232.604MILL BITUMINOUS PAVEMENT (SPECIAL)S Y173$8.00$1,384.00$29.50$5,103.50$15.00$2,595.00$10.00$1,730.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2,C)TON8,300$53.35$442,805.00$61.80$512,940.00$55.00$456,500.00$66.75$554,025.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2,C)TON6,400$56.85$363,840.00$62.70$401,280.00$54.00$345,600.00$75.25$481,600.00
2501.50218" CS PIPE APRONEACH2$150.00$300.00$200.00$400.00$290.00$580.00$385.00$770.00
2501.50224" CS PIPE APRONEACH2$250.00$500.00$249.00$498.00$340.00$680.00$495.00$990.00
2501.502INSTALL CULVERT MARKEREACH4$60.00$240.00$29.90$119.60$75.00$300.00$82.50$330.00
2501.50218" RC SAFETY APRONEACH1$2,262.00$2,262.00$2,190.00$2,190.00$2,130.00$2,130.00$825.00$825.00
2501.50318" RC PIPE CULVERTL F235$49.00$11,515.00$53.90$12,666.50$60.00$14,100.00$66.00$15,510.00
2501.50324" CP PIPE CULVERTL F110$54.00$5,940.00$44.90$4,939.00$94.00$10,340.00$50.50$5,555.00
2501.50318" CP PIPE CULVERTL F72$33.00$2,376.00$39.90$2,872.80$62.00$4,464.00$39.00$2,808.00
2506.501CONST DRAINAGE STRUCTURE DES 48-4020L F12$494.00$5,928.00$473.00$5,676.00$445.00$5,340.00$475.00$5,700.00
2506.502CASTING ASSEMBLYEACH2$605.00$1,210.00$997.00$1,994.00$675.00$1,350.00$750.00$1,500.00
2511.507RANDOM RIPRAP CLASS IIC Y10$54.00$540.00$39.90$399.00$150.00$1,500.00$90.00$900.00
2531.503CONCRETE CURB & GUTTER DESIGN D418L F220$36.00$7,920.00$35.90$7,898.00$36.00$7,920.00$39.50$8,690.00
2531.5046" CONCRETE DRIVEWAY PAVEMENTS Y46$60.00$2,760.00$59.90$2,755.40$60.00$2,760.00$66.00$3,036.00
2531.6048" CONCRETE VALLEY GUTTERS Y137$88.00$12,056.00$87.80$12,028.60$88.00$12,056.00$97.00$13,289.00
2540.602INSTALL TEMPORARY MAIL BOX SUPPORTEACH26$35.00$910.00$34.90$907.40$35.00$910.00$38.00$988.00
2540.602MAIL BOX SUPPORTEACH15$110.00$1,650.00$110.00$1,650.00$110.00$1,650.00$120.00$1,800.00
2540.602RELOCATE MAIL BOX SUPPORTEACH11$65.00$715.00$64.80$712.80$65.00$715.00$71.00$781.00
2540.602INSTALL FIRE NUMBEREACH17$45.00$765.00$44.90$763.30$45.00$765.00$49.00$833.00
2563.601DETOUR SIGNINGLS1$3,775.00$3,775.00$1,900.00$1,900.00$1,500.00$1,500.00$1,650.00$1,650.00
2563.601TRAFFIC CONTROLLS1$6,335.00$6,335.00$1,900.00$1,900.00$1,800.00$1,800.00$1,650.00$1,650.00
2564.602INSTALL STEEL POSTEACH2$40.00$80.00$39.90$79.80$40.00$80.00$110.00$220.00
2573.502CULVERT END CONTROLSEACH5$75.00$375.00$74.80$374.00$75.00$375.00$275.00$1,375.00
2573.503SILT FENCE, TYPE MSL F842$1.75$1,473.50$2.00$1,684.00$1.75$1,473.50$2.20$1,852.40
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERL F842$3.25$2,736.50$2.00$1,684.00$3.25$2,736.50$2.50$2,105.00
2573.601STORM WATER MANAGEMENTLUMP SUM1$2,350.00$2,350.00$4,770.00$4,770.00$1,500.00$1,500.00$2,500.00$2,500.00
2573.610SEDIMENT REMOVALHOUR10$125.00$1,250.00$1.00$10.00$281.00$2,810.00$350.00$3,500.00
2574.505SOIL BED PREPARATIONACRE5$75.00$375.00$99.80$499.00$75.00$375.00$275.00$1,375.00
2574.507COMMON TOPSOIL BORROWC Y50$45.00$2,250.00$20.00$1,000.00$40.00$2,000.00$56.00$2,800.00
2574.508FERTILIZER TYPE 1LB998$0.50$499.00$0.59$588.82$0.50$499.00$0.66$658.68
2575.505SEEDINGACRE5$75.00$375.00$99.80$499.00$75.00$375.00$275.00$1,375.00
2575.508SEED MIXTURE 25-121LB304$3.83$1,164.32$3.45$1,048.80$3.83$1,164.32$4.50$1,368.00
2575.508HYDRAULIC BONDED FIBER MATRIXLB17,465$0.85$14,845.25$1.00$17,465.00$0.85$14,845.25$1.10$19,211.50
2575.508SEED MIXTURE 21-111LB250$0.80$200.00$0.50$125.00$0.80$200.00$0.55$137.50
2575.508HYDRAULIC MULCH MATRIXLB10,000$0.40$4,000.00$0.40$4,000.00$0.40$4,000.00$0.83$8,300.00
2582.5034" SOLID LINE MULTI COMPL F37,957$0.21$7,970.97$0.21$7,970.97$0.21$7,970.97$0.22$8,350.54
2582.5034" DBLE SOLID LINE MULTI COMPL F8,716$0.42$3,660.72$0.42$3,660.72$0.42$3,660.72$0.44$3,835.04
2582.5034" BROKEN LINE MULTI COMPL F8,762$0.04$350.48$0.04$350.48$0.04$350.48$0.22$1,927.64
 Totals for project CP 71-606-017 $1,362,046.20 $1,440,625.89 $1,550,622.74 $1,767,073.05
 
Contract Total:$1,362,046.20$1,440,625.89$1,550,622.74$1,767,073.05