ADVERTISEMENT FOR BIDS

Sherburne County – Fiber Optic Conduit Installation
C.P. 071-FIB-020

SHERBURNE COUNTY, MINNESOTA
 

 


Notice is hereby given that sealed Bid Proposal Packages will be received by the Sherburne County Engineer at the office of the undersigned until 1:00 p.m. on the 30th day of July 2020.

The Major Quantities of Work are:
74,250 LF          1.25” Non-metallic Conduit
42 EACH            Fiber Optic Vault/Handhole
1 LUMP SUM    Seed, Mulch and Restoration

Receipt of Bid Proposal: Bids will be received at the Public Works Office, located at the Sherburne County Government Center, 13880 Business Center Drive, Elk River MN 55330 until 1:00 p.m., July 30th, 2020.

Bid Opening: Proposals will be opened publicly by the County Engineer after the hour set for receiving bids at the Sherburne County Government Center, Aspen Conference Room; 13880 Business Center Drive, Elk River MN 55330.

Plans and specifications may be examined at the office of the Sherburne County Highway Engineer, 13880 Business Center Drive, Elk River MN 55330., or at http://www.co.sherburne.mn.us/publicworks/index.php and follow the Construction Projects & Bids (eGram) link. A user ID and password is required to download the Plans and Specifications. Contact Public Works at 763-765-3300 to obtain.

The cost to download the Plans & Specifications is free.

The cost to obtain a hard copy of the Plans & Specifications is $50.00 with an additional $10.00 mailing fee.

TO SUBMIT A BID – A Bid Proposal Package must be purchased. The cost to obtain the Bid Proposal Package is $10.00. Requests are made to the Sherburne County Engineer, 13880 Business Center Drive, Elk River MN 55330.

Requests must be accompanied by check, draft, or money order, payable to the Sherburne County Public Works. Bids must be accompanied by a Certified Check or Bidder’s Bond made payable to the Sherburne County Treasurer as a proposal guarantee for at least 5% of the amount of the bid.

No bidder may withdraw their bid (which shall include the Certified Check or the Bidder’s Bond) within 15 days after the scheduled closing time for the receipt of bids.

The County desires that construction of the project be completed no later than early to mid-September.

The County Board reserves the right to reject any or all bids and to waive informalities.

Dated at Elk River Minnesota, this   15th  day of  July, 2020.

Signed: Bruce Messelt, Sherburne County, Minnesota